SACS Reaffirmation
Objective | Campus Master Plan | |
Use a "Request for Proposal" to find a firm to prepare a "Master Plan" for SHSU for the period 2010-2020. Associated Goals: Campus Master Plan |
Indicator | Campus Master Plan It is timely to prepare a new 10 year Master Plan for SHSU Campus. |
Criteria | Campus Master Plan Develop a request for proposal for architects and engineers to propose their selection as the Master Planner for the period 2010-2020. |
Finding | Campus Master Plan Complte a 10 year master plan during October 2007-July 2008 tgimeframe by selecting a Master Planner |
Action | Campus Master Plan A Master Planner for 2010-2020 is being developed during period October 2007 - July 2008. |
Objective | Compare State Appropriation To Higher Ed Funding Ranking | |
Review state appropraitions for higher education for FY '2s 2008 and 2009. Review formula, non-formula and special item funding for State of Texas Universities (35). Associated Goals: Compare State Appropriations To Higher Ed. Funding Ranking |
Indicator | Compate State Appropriation To Higher Ed Funding Ranking Examine funding per "fte" student for 35 State of Texas Universities. |
Criteria | Compare State Appropriation to Higher Ed Funding Ranking Examine funding for instruction/operations and infrastructure formulas and funding for non-formula and special item funding. |
Finding | Compare State Appropriation to Higher Ed Funding SHSU does not have an engineering or nursing program. Both of these revie higher funding per fte. SHSU received only a $10 million tuition revenue bond appropraition for a Performing Arts Building. Institutional Enhancement and Excellence funding are low for SHSU. |
Action | Compare State Appropriation to Higher Ed Funding SHSU''s State Representative and State Senator will be informed of findings and additional funding sought for FY 2010 and 2011 biennium |
Objective | Parking Lot-Colony | |
Select an engineer to design a 270 space student parking lot on the site of demolished Colony Apartments. Associated Goals: Parking Lot-Colony |
Indicator | Parking Lot-Colony Design and cnstruction of a student parking lot. |
Criteria | Parking Lot-Colony Hiree a civil engineer to design a student parking lot of at least 270 spaces. Bid and award a construciton contract. Complete construction project and open for use the parking lot. |
Finding | Parking Lot-Colony 270 space parking lot under construction. |
Action | Parking Lot-Colony Parking lot of 270 spaces opened for use on March 20, 2008. |